Process Reagents
Mining chemicals for the leach and adsorption circuit.
Every item below is designed and fabricated in our own workshop, then installed and commissioned on your site by our crews.
Customised carbon-in-pulp plants ranging from 40 tonnes to 700 tonnes per day. We supply the complete circuit — feed arrangement, milling, agitation and adsorption tanks, inter-stage screens, pumps, launders, walkways and electrics — built to suit your tonnage and your ore.
| Throughput range | 40 – 700 tonnes per day |
|---|---|
| Process | Carbon-in-pulp gold adsorption |
| Configuration | Fixed, skid-mounted or truck-mounted |
| Scope | Design, fabrication, delivery, installation, commissioning |
High and low pressure elution boiler systems ranging from 300 kg to 2 tons. Supplied complete with electrical control panels, transformers, pipework and thermal insulation — ready to strip loaded carbon and get your gold into solution.
| Capacity range | 300 kg – 2 tons |
|---|---|
| Types | High pressure & low pressure |
| Supplied with | Control panel, transformer, insulation, pipework |
| Materials | Stainless steel vessel, carbon steel structure |
Crushing plants and complete processing plants — jaw crushing, conveying, milling and classification — supplied as fixed installations or mounted on a skid or truck bed for operations that need to follow the ore.
Rolled, welded and tested in our own workshop, to your capacity and your duty.
Our plate rolling machine is a W11–16×2500, equipped with a cone rolling device — so tank shells, cones, hoppers and vessel bodies are all made here rather than subcontracted out.
We supply mining chemicals and related consumables, so the plant we build for you can be kept running from the same supplier.
Mining chemicals for the leach and adsorption circuit.
Adsorption carbon for CIP and elution circuits.
Mill balls and liners to keep comminution on spec.
Pumps, screens, valves and wear components.
Ask us for the current stock list and pricing — availability changes with each shipment.
Tell us your tonnage and your ore, and we will come back with a costed proposal.